A Better Way to Track the 8 Wastes in your Lean Program.
Easily track which projects are benefiting your Lean Manufacturing Program- starting with the 8 Wastes.
Define Your Wastes with Tags:
Settings –> Categories / Tags / Pareto
- New companies have the 8 Wastes of Lean set as default tags
 - Tags can be added and deleted to customize the list
 
The 8 Wastes of Lean Manufacturing are:
- Defects
 - Overproduction
 - Waiting
 - Non-Utilized Talent
 - Transportation
 - Inventory
 - Motion
 - Excess Processing
 

Assign Tags to Projects
- Charter Tile:
- Can also create new tags by typing in the input field
 - Select the box(es) to assign a tag to the project
 - Can deselect tags but can only delete tags from the Settings
 
 

Track your Projects based on the 8 Wastes and other Tags
- Project Summary Report:
- Create a report to visualize how many projects are eliminating each waste
 
 
